Capturing an erosion parcel

How to capture erosion parcels in Landonline.

Erosion parcels are captured spatially as separate parcels in Landonline - the extinguished primary parcel is divided into 2 new primary parcels: a ‘dry’ primary parcel, and a ‘wet’ primary parcel.

See also:
Irregular lines
Merge irregular line
Capturing an accretion parcel

How to capture an erosion parcel

  1. Select New parcels in the Workflow control bar to open the New parcels panel.

    Screenshot of spatial capture screen with the New parcels icon in the workflow toolbar highlighted. The new parcels panel is open.
  2. Select + Add new parcel.

    screenshot of new parcels panel. "Add new parcel" is highlighted at bottom left of panel.
  3. Double-click the Intent field for the new parcel. Select Erosion from the dropdown list.

    screenshot of new parcels panel with the intent field selected. There is a drop-down open with the available parcel intents listed. "Erosion" is highlighted.
  4. Open the Appellation panel by double-clicking in the Appellation field for the new parcel.

    screenshot of new parcels panel with the appellation field highlighted.
  5. Untick Appellation required for this parcel. The remaining fields will change to grey. Select Save appellation.

    screenshot of appellation panel, with "Appellation required for this parcel" highlighted at top of panel. Also highlighted is "Save appellation" at bottom left of panel.
  6. Double-click the Layer field for the erosion parcel. In most cases the layer will be Primary. Select Primary.

    Screenshot of new parcels panel, with Layer field highlighted. The drop-down shows the available layers for the parcel. "Primary" is highlighted.
  7. Left-click the 3 dots at the end of the row. Select Link to link the parcel.

    screenshot of new parcels panel with the three dots menu highlighted. The mouse is hovering over "Link".
  8. Left-click to select the parcel in Spatial view. The selected parcel will turn pink. Click Link Parcel.

    screenshot of spatial capture screen, with parcel linking in process. A parcel has been selected and is coloured pink. "Link parcel" at bottom right of screen is highlighted.
  9. The new erosion parcel is now linked in the New parcels panel.

    Screenshot of new parcels panel, highlighting the "linked" icon for the erosion parcel.
  10. In Plan Generation, in the layout plan sheets, add the word ‘Erosion’ as user added text to the Diagram of parcels.

    Screenshot of a layout page in plan generation. The word "erosion" has been added in user-added text to the erosion parcel.

For information on how to add a label in Plan Generation, see:
Add label

Last updated